| DPI |
Abrolhos Islands navigational aids Pelsaert Group |
| TDRSS Facility Mingenew |
Construct facilities for satellite installation |
| FMG - Cloudbreak |
Tilt panel retaining walls for ROM pads with stabilised fill |
| Verve Energy |
Coral Bay power station and wind farm civils |
| AGC Industries |
Civil works Challenge TAFE process plant training facility at Henderson |
| Birla Nifty |
Backfill services contract |
| Iluka Resources |
Concrete civils at Waroona mine site |
| Civmec |
Stabilised backfill at Tom Price and Yandi. |
| Indee Gold Project |
Concrete civil construction works for new mine |
| Emily Anne Mine |
25000 m3 mine backfill |
| Mid West Mining |
Concrete footings and walls for iron ore storage facility in Geraldton |
| Roc Oil Dongara |
Earthworks and 3000m3 concrete civil construction of oil storage and load out facility |
| Iluka Resources Gingin |
Civil construction for new mining plant |
| Lion Ore Australia (Thunderbox) |
Supply and lay concrete base slabs for camp and plant area |
| Resort Marina, Maldives |
Supply and construction of floating marina for holiday resort Maldive Islands |
| Origin Energy |
Civil supply and construction on oil field sites |
| Bicton Baths Jetty |
Demolition and reconstruction of stage one and two timber jetty reconstruction. |
| Dampier Salt |
Tilt slab retaining walls with stabilized back fill |
| Halls Creek Shire |
Construction of culvert crossing Tanami Desert |
| Sydney Boat show |
Construction and project management of temporary marina |
| Alcoa mine site Pinjarra |
Construction of crusher walls and stabilized back fill |
| Sanctuary Cove Qld |
Construction and maintenance of boat show marina |
| South Perth Marine Facility |
Stage 2 construction of new marina |
| Emily Anne mine |
6000m3 mine shaft back fill |
| Marina Construction Ballina NSW |
Removal of old jetty and construction of floating marina. |
| Tullering Peak Iron Ore |
Concrete civil construction for crusher and supply grids |
| Iluka Resources |
Progressive civil and earth works at Eneabba mine site. |
| Halls Creek Shire WA |
Project management and Aboriginal training for concrete civil construction. |
| Calm WA Penguin Island |
Refurbishment and upgrading of public access walk ways. |
| Iluka Resources |
Haul Road floodway crossing and adjoining road works. |
| Lion Ore |
CAF backfill 12344 cubic metre and 5432 cubic metre continuous concrete pours. |
| Walcon Marine |
Manufacture and installation of the floating jetties at Sydney International Boat Show. Refreshment Sanctuary Cove marina QLD. Refurbishment South of Perth Yacht Club and Monteray Bay Marina Mandurah. |
| Como Engineers |
Challenger gold project South Australia |
| Shire of Irwin |
Design and construction of new jetty. |
| Dongara Professional Fisherman’s Association/DPI |
Port Denison Marina Development consisting of the design and construction of a boat pen facility and wharf. |
| Department for Planning & Infrastructure |
Construction of Port Denison amateur boat launching facilities. Construction of Greenhead boat ramp. Abrolhos Islands Easter Group Navigation Aids |
| Golden Grove |
Dump bridge repairs and grizzly |
| Big Bell Gold Mine |
Gravity circuit construction. |
| Argyle Diamonds |
New diamond tails plant. |
| Australian Raise Drilling |
Raise drill foundation and liner grouting. |
| Kerman Contracting |
Newman plant civils at Iluka Resources Eneabba. |
| Homestake Gold |
Construction of gravity circuit. |
| Network Design & Construction |
Tower footings for communications towers at various locations around Western Australia. Precast footings for communications huts and solar panels. |
| Barrow Island |
Power station upgrade. |
| RAAF Base Learmonth |
Construction of ordinance loading bays. |
| Telstra |
Construction of tower footings at various locations in Western Australia. |
| RGC Geraldton |
Waste gas clarifier bund replacement. |
| Exmouth Shire |
Road culverts upgrade and grids. |
| Mallina Holdings Geraldton |
Construction of diatomaceous earth warehouse and infrastructure and weighbridge. |
| CSBP Geraldton |
Construction of lime recycling bunds and evaporation ponds. |
| Ti-West Jnt Venture |
Construction of thickener base for mineral sands. Satellite mine relocation. |
| Dongara Professional Fishermans Association |
Manufacture precast panels and construct boat ramp at Port Denison Marina. |
| Jaxon Construction |
Construction of medical centre at Dongara. |
| West Australian Water Auth |
Various concrete water storage tanks. |
| Westfarmers Fornam Gold Mine |
Construction of Nitropill explosive magazines. |
| Discovery Petroleum |
Construction of oil pump jack bases and oil outload facilities. |
| Shark Bay Salt Mine |
Construction of workshop pads, wash down pads, and salt washery. Construction of island conveyor. |
| Consolidated Gas Woodada |
Construction of compressor station concrete facilities including process piping, metering and compressor foundations. |
| BHP Griffin Gas Plant Tubridgi |
Paving, bunding and drainage concrete civils. Water separation and environmental concrete works. |
| West Australian Petroleum |
Main line valve installation concrete construction, compressor station metering, instrumentation, process and re-injection piping facilities. Oil load out facilities, tank bunds, stabilised earth bunded areas, miscellaneous concrete associated with EPA and environmental issues. Various concrete works on Thevenard Island. |
| Varanus Island |
Construction of supply barge and offshore support vessel off loading facilities. Compressor slabs, separator pits, turbine compressor bases, generator concrete civils. Upgrade of new pipeline civil works. 400 precast footings and sleepers. |
| Twin Shafts Gold Mine Sandstone |
Construction of concrete mine civils for cyanide induction process and mine plant layout |
| Main Roads |
Construction of Culvert Bridge at Marble Bar |
| East Pilbara Shire |
Construction of concrete river crossings |